{"id":1842,"date":"2020-01-20T14:08:00","date_gmt":"2020-01-20T08:23:00","guid":{"rendered":"https:\/\/www.nepalarchives.com\/news\/2020\/01\/20\/five-hydroelectricity-projects-under-construction-in-lamjung\/"},"modified":"2020-01-20T14:08:00","modified_gmt":"2020-01-20T08:23:00","slug":"five-hydroelectricity-projects-under-construction-in-lamjung","status":"publish","type":"post","link":"https:\/\/www.nepalarchives.com\/news\/2020\/01\/20\/five-hydroelectricity-projects-under-construction-in-lamjung\/","title":{"rendered":"Five hydroelectricity projects under construction in Lamjung"},"content":{"rendered":"<p>Five hydropower projects are under construction in the district at the total cost of Rs 23 billion. These hydel projects are based in Dordikhola and Dordi corridor.<\/p>\n<p>The under-construction hydro projects include 54 megawatts Super Dordi &#8216;B&#8217; by People&#8217;s Hydropower Company, 27 megawatts Dordikhola by Himalayan Power Partner, 25 megawatts Dordi &#8216;A&#8217; by Liberty Energy Limited, 12.1 megawatts Dordi 1 by Dordikhola Hydropower Company and four megawatts Dordi corridor by Chhangdi Khola Hydropower Company.<\/p>\n<p>Most of them have seen 55 to 90 percent construction completion. All the projects have been funded jointly by private sector and local people.<\/p>\n<p>Of them, Dordi Khola and Dordi &#8216;A&#8217; are scheduled to complete in one year.<\/p>\n<p>Likewise, 55 percent of the construction of Super Dordi &#8216;B&#8217; has been completed, and 70 percent of the construction of Dordi 1. The construction cost of Super Dordi &#8216;B&#8217; is estimated to be Rs 8.8 billion. Likewise, Dordi Khola is estimated to cost Rs 3.8 billion funded jointly by Non-Resident Nepali Association (36 percent), local people (30 percent) and IME group (34 percent).<\/p>\n<p>Dordi &#8216;A&#8217; is estimated to cost Rs 4.6 billion, Dordi 1 Rs 2.3 billion and Dordi corridor Rs 800 million.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Five hydropower projects are under construction in the district at the total cost of Rs 23 billion. These hydel projects are based in Dordikhola and&#8230;<\/p>\n","protected":false},"author":3,"featured_media":1535,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[335,330],"class_list":["post-1842","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-lamjung","tag-nepal"],"_links":{"self":[{"href":"https:\/\/www.nepalarchives.com\/news\/wp-json\/wp\/v2\/posts\/1842","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nepalarchives.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nepalarchives.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nepalarchives.com\/news\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nepalarchives.com\/news\/wp-json\/wp\/v2\/comments?post=1842"}],"version-history":[{"count":0,"href":"https:\/\/www.nepalarchives.com\/news\/wp-json\/wp\/v2\/posts\/1842\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.nepalarchives.com\/news\/wp-json\/wp\/v2\/media\/1535"}],"wp:attachment":[{"href":"https:\/\/www.nepalarchives.com\/news\/wp-json\/wp\/v2\/media?parent=1842"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nepalarchives.com\/news\/wp-json\/wp\/v2\/categories?post=1842"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.nepalarchives.com\/news\/wp-json\/wp\/v2\/tags?post=1842"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}