February 21, 2020
for
Created by RSS Nepal

Kaligandaki ‘A’ hydropower station shut down for three days

Kaligandaki ‘A’ hydropower station at Mirmi, Syangja, Nepal’s biggest half-reservoir hydropower project, has been shut down for three days from today for repair and maintenance, said the Nepal Electricity Authority.

Repair started on Thursday at 11 pm after halting electricity production, after the main inlet valve started leaking water, said NEA’s executive director Kulman Ghising.

The 144 megawatts hydropower project produced average 58 megawatts electricity at present due to receding water level in the Kaligandaki river. It had been facing operation halt for repair every year.

Power generated from the station was being supplied towards Pokhara and Butawal. As a result, electricity supply to industries in western parts might be cut at the peak hour in the evening, he said, adding that a 37-member technical team has been mobilised for repair.

Related Posts
Explore more content that matches your interests with these suggestions!
April 11, 2020
for

-Ramesh Giri As the nation remains in a lockdown, 24 truck loaded with coal arrived at various brick kilns of Bhaktapur. They were transporting coal...

Created by RSS Nepal
April 11, 2020
for

Visual editor at Nepal Television Satish Koirala died of cancer on Friday. He was 37. He died at Rajiv Gandhi Cancer Institute and Research Centre...

Created by RSS Nepal
April 11, 2020
for

The government is conducting a thorough study regarding the impact of COVID-19 on Nepal’s tourism sector. Tourism industry in the country is paralyzed owing to...

Created by RSS Nepal
April 11, 2020
for

‘Throat swab’ of over 400 people who returned from different cities of India to Darchula district has been collected. Samples of swabs from total 461...

Created by RSS Nepal